@bossman
Batch 6 still open (spot or two left). Timber rough design has been completed, but no prototype built yet. Inline design is isn't about safety, just preference, variety. Price is still too soon to tell, I'll know after I build a few. The first prototypes should probably happen over the summer months. There are several items on the agenda at Vapwood, not just Timber, so it's hard to predict exact dates right now. We are going to be moving in lots of directions.
Batch 6 still open (spot or two left). Timber rough design has been completed, but no prototype built yet. Inline design is isn't about safety, just preference, variety. Price is still too soon to tell, I'll know after I build a few. The first prototypes should probably happen over the summer months. There are several items on the agenda at Vapwood, not just Timber, so it's hard to predict exact dates right now. We are going to be moving in lots of directions.