has the grasshopper been released yet?
if not, when?
4/1/15has the grasshopper been released yet?
if not, when?
I hope that there aren't many people considering cancelling, doesn't bode well..
The issue with that is, if no one goes to see Episode 7 but you, there won't be an Episode 8...When waiting in a long line and people ahead start bailing and my turn comes up quicker, is kind of the definition of boding well. I hope nobody goes and sees SW:EP7 for the same reason.
Edit: is this the part where we compare how crappy our first personal computers are? If so, let's just skip to the end where @lwien shares his stories of punch card computing...
The issue with that is, if no one goes to see Episode 7 but you, there won't be an Episode 8...
So I emailed Trevor on the actual supply of heaters and other electronics and here's what I got:
"Thanks for contacting me. The heaters are coming in and the batch size is increasing. This is a bottleneck right now. The electronics come in larger batches but there is an extensive supply chain involved in the components used on the PCBs. A hick-up here holds production up until that part comes in. We are just starting this while mass production thing and we want to get it right so it takes careful planning to scale up. We will get the process moving faster and faster. The heaters first came in 6 per batch and we are already up to batches of about 300. The first batches of electronics were in 50 and we are now ramping up to a batch size of 3000."
Sounds like heater supply will constantly increase as production speeds up?
Well, I could be wrong, but the heaters at least I believe they have only been getting for something like a month, and if that's true, then it gives a pretty good indication. Going from 6 heaters a batch to 300 a batch in a month's time is a significant improvement, though who knows how many "batches" they've actually gotten. It may have been just two, one with 6 and one with 300, but it still trends toward progress.Sounds good, but without knowing how often they are receiving these larger batches, it doesn't really tell us much. Would also be interesting to know how long it takes them to assemble one GH once all the parts are sitting there.
And we don't know for sure if they had to change anything about the heaters' design to get that increase in production.Well, I could be wrong, but the heaters at least I believe they have only been getting for something like a month, and if that's true, then it gives a pretty good indication. Going from 6 heaters a batch to 300 a batch in a month's time is a significant improvement, though who knows how many "batches" they've actually gotten. It may have been just two, one with 6 and one with 300, but it still trends toward progress.
Except that we've been told over and over again in emails that none of the stats of the heaters have been changed. Like people have said that COULD be a carefully worded evasion, but I feel like they'd have to realize that there would be a ton of backlash if people found out they'd changed the design and not told anyone, so much so it might ruin them. Edit: That said, I'm not even entirely against a re-design, if it doesn't impact the function in a severe way as long as they were completely up front about the change being made.And we don't know for sure if they had to change anything about the heaters' design to get that increase in production.
And we don't know for sure if they had to change anything about the heaters' design to get that increase in production.
I'm looking forward to seeing their reply.I sent an email to Trevor myself a short while ago just asking for confirmation that NOTHING about the heater has changed, wattage, design, etc. Hopefully I'll hear something before long.
Again with the very same suspicious omission...So I emailed Trevor on the actual supply of heaters and other electronics and here's what I got:
"Thanks for contacting me. The heaters are coming in and the batch size is increasing. This is a bottleneck right now. The electronics come in larger batches but there is an extensive supply chain involved in the components used on the PCBs. A hick-up here holds production up until that part comes in. We are just starting this while mass production thing and we want to get it right so it takes careful planning to scale up. We will get the process moving faster and faster. The heaters first came in 6 per batch and we are already up to batches of about 300. The first batches of electronics were in 50 and we are now ramping up to a batch size of 3000."
Sounds like heater supply will constantly increase as production speeds up?
We knew this ~a week ago. The rest was just speculative bs/noise, luv this thread!The heaters are coming in and the batch size is increasing. This is a bottleneck right now.
Maybe we do need a "email highlight thread" of some sort..We knew this ~a week ago. The rest was just speculative bs/noise, luv this thread!