Shipping has begun for the Portsides, batch 2.
About 1/2 way through the list.
So as a reminder about battery installation. Only 4 screws need to be removed.
Rest unit with battery gauge facing down.
Remove upper two screws on the back side with the switch and charge plug.
Remove the bottom two screws on front plate.
Lid will slide forward and you will see battery holder.
Insert your batteries as batteries label shows.
Reassemble.
Enjoy!
About 1/2 way through the list.
So as a reminder about battery installation. Only 4 screws need to be removed.
Rest unit with battery gauge facing down.
Remove upper two screws on the back side with the switch and charge plug.
Remove the bottom two screws on front plate.
Lid will slide forward and you will see battery holder.
Insert your batteries as batteries label shows.
Reassemble.
Enjoy!