DocAnchovy
Well-Known Member
Someone can correct me based on this use case, and I can only speak for the gorilla glue 2 part epoxy. it is fairly quick (I think 2 hours). The label in bold states to “leave for 24 hours for heavy loads.” I think 12+ hours is fine, with 24 being 100% (adjusted for thickness of epoxy applied)Anyone know how long the epoxy needs to cure before it is “safe” to use?