Yup... Told
@stickstones he should send Sarah back for a heater upgrade lol.
The beta team and I have been discussing rollout. The idea here is to do a soft start. Although we just completed our forth iteration of the product and most of the engineering and characterization is done, there still might be some small issues that come up with the FC100. I expect that any issues that come up will be small... Slight fit issues with the cap, battery contacts are to loos on battery, issues with finish etc. some of the issues won't change the design but will add rigor to the quality plan to tighten control over say surface finish issues like smoothness. We would like to issue 10 units first. These will be sold to the most active members on the forum. These units should provide the Lion's share of the feedback for the few things that need to change. After several weeks we will make any required changes and produce another 30 units. These will be validation units that will be run through the full official manufacturing process with all production parts (example first 10 may have hand made screen retention rings). These will again see several weeks of use while we build the remaining units to complete the order. The. The whole FC fleet will see another month or so of use before we start full production release. This process could take as little as a few months or could take longer depending on what we find. Given that with
@stickstones recent input and the optimization of the temperature profile I will be surprised if
@pakalolo finds any significant issues with his unit.
This plan is intended to get the units out as fast as possible starting with guys like
@HD Springer who's pay to play attitude make them ideal early adopters. Folks with more patience and less appetite for risk is lower can wait for the later unit.
I have a feeling that the second 90 units will be 97% finished and that there will be six months or more before we change the design. The play is iterate and test test test up to production launch and then don't change a thing in order to gain stability. I don't see much changing other than the button... And yes, the FC100 team can expect special treatment from RBT hopefully for many years to come!